Slurry Solutions supported McConnell Dowell during remedial works at Swanson Dock, where new infrastructure was installed on an existing concrete pier. Core drilling works required strict control of concrete slurry to prevent discharge into the bay. We supplied a BigDog T2000 slurry treatment system, along with SlurrySep flocculant and felt-lined dewatering bags, enabling full capture, treatment, and filtration of slurry water. Treated water was tested on site to confirm compliance before being safely released back into the bay, ensuring full environmental and EPA requirements were met.